Workflows FAQ

Quick answers to common questions about BMad Method workflows and phases.

What’s the difference between workflow-status and workflow-init?

Section titled “What’s the difference between workflow-status and workflow-init?”
  • workflow-status — Checks existing status and tells you what’s next (use when continuing work)
  • workflow-init — Creates new status file and sets up project (use when starting new project)

If status file exists, use workflow-status. If not, use workflow-init.

Yes! Phase 1 is optional for all levels, though recommended for complex projects. Skip if:

  • Requirements are clear
  • No research needed
  • Time-sensitive work
  • Small changes (Level 0-1)
  • Level 0-1 — Never (skip entirely)
  • Level 2 — Optional (only if system design needed)
  • Level 3-4 — Required (comprehensive architecture mandatory)
Section titled “What happens if I skip a recommended workflow?”

Nothing breaks! Workflows are guidance, not enforcement. However, skipping recommended workflows (like architecture for Level 3) may cause:

  • Integration issues during implementation
  • Rework due to poor planning
  • Conflicting design decisions
  • Longer development time overall

For Level 3-4, run the implementation-readiness workflow. It validates PRD + Architecture + Epics + UX (optional) are aligned before implementation. Pass the gate check = ready for Phase 4.

Most workflows must be sequential within a phase:

  • Phase 1 — brainstorm → research → product-brief (optional order)
  • Phase 2 — PRD must complete before moving forward
  • Phase 3 — architecture → epics+stories → implementation-readiness (sequential)
  • Phase 4 — Stories within an epic should generally be sequential, but stories in different epics can be parallel if you have capacity